Questions and Answers
Straight answers about design, permits, schedules and living at home during the work.
It depends on how far you go. A light remodel replaces counters, backsplash and lighting. A full remodel adds new cabinets, flooring and often new wiring and plumbing. We measure first and show you both paths with separate line items.
If the job adds circuits or outlets, changes drain lines or touches gas piping, yes. The City's permit Q&A lists all three as permitted work. Swapping cabinets and counters in place without that work usually doesn't trigger one.
Several weeks of on-site work is typical for a full remodel, with design and cabinet lead time before that. Countertops are templated after cabinets are set, which adds a short gap. Your estimate comes with a week-by-week schedule.
Because the drawing decides the price. Cabinet count, countertop square footage and the number of new circuits all come from the layout. A measured plan gives you a number you can trust.
The whole City of Glendale, including Arrowhead Ranch, Historic Catlin Court, Sierra Verde, the Westgate area, Stonehaven and the neighborhoods around Sahuaro Ranch Park.
Yes. The City's building permit Q&A says new electrical circuits and outlets need a permit, because wire size, connections and wiring methods matter. Replacing a loose receptacle doesn't.
The City says a permit expires if work doesn't begin within 180 days of issue. You also have to pass at least one inspection every 180 days to keep it active.
We don't recommend it. Cabinet sizes depend on exact appliance models, the window position and where the plumbing ends up, so we finalize the drawing first.
Most households set up a temporary station in the laundry room, garage or dining room with the fridge, a microwave and a coffee maker. We help plan it.